Unmatched expertise
Having the right tools and team is part of the battle – Apache has that. The other part of the story is deep experience and know how. Apache Services has a proven track record of work which demonstrates our ability to deliver and deliver well.
Norwood to Mowbray 110kV Project
Apache Services is providing Civil Services to Jemena Asset Management for the installation of 110kV cable for Transend Networks. This project consists, for the most part, of Horizontal Directional Drilling (HDD) to install the conduit into the ground.
Read more…
NBN Rollout 2010
The National Broadband Network (NBN) is an Australian Government initiative and represents the largest ever infrastructure project undertaken in this country. Apache Services was contracted by John Holland to work on the NBN Rollout on two sites, Smithton and Midway Point. The installation of Optic Fibre Cable was delivered via Horizontal Directional Drilling.
Read more…
Aurora Energy - Rokeby Pass Road
Apache has had an ongoing affiliation with Aurora Energy since 2006. The affiliation has seen delivery of power and telecommunication infrastructure including the installation of cable and conduit for underground mains power supply across Tasmania. This work has been delivered through the process of Horizontal Directional Drilling and/or Trenching.
Read more…
Optus Telecommunications
Optus is Australia’s second largest telecommunications company. More and more of Australia is being covered by fast broadband and Apache is a reliable and capable cabling supplier. Apache is currently delivering the following projects for Optus in Tasmania.
Read more…
A proven track record
Apache Services has a proven track record and extensive national experience, that include the following past projects:
- 2004 – Apache was contracted by John Holland/Melbourne Water on the Palmer St Drain Diversion, to construct small drains that were installed along a section of Elizabeth Street, Kent Street and Highett Street. Apache was also responsible for the construction of the Yarra outlet structure which was constructed through a concrete pipe. This included a difficult excavation below the water level of the Yarra.
- 2005 – Apache worked for Sydney Water/John Holland on the Priority Sewerage Program. Apache’s role in the PSP Alliance was to undertake Directional Drilling and installation of sewage mains. Apache’s experience in underground technology enabled the Alliance to deliver difficult sections of the project on time and on budget.
- 2006 -2008 Installation of 30km of Gas Pipe line throughout Hobart.
- 2008 – Apache Services were contracted by Clarence City Council to install 215m of water main. This project was undertaken in a dense urban environment being in the main street of Clarence City. Apache provided all labour, plant , materials and other resources necessary to construct the water main, remove existing water main components, and clean up the site to a condition equivalent to that prior to the work.
- 2010 – Apache Services were contracted by John Holland to work on the National Broadband (NBN) Rollout on two sites, Smithton and Midway Point. The installation of Optic Fibre Cable was delivered via Horizontal Directional Drilling.
- 2010 – Apache Services were contracted by Broadband Services Australia (BSA) to deliver 150 house lead in’s via Directional drilling and trenching in Scottsdale Tasmania.
Read more…